查看单个帖子
旧 24-07-04   #11 (永久链接)
deedeee
印前中士
同城: 未知
 
会员ID:81156
注册日期: 23-12-09
帖子: 7
印前币: 134.88
致谢数: 0
获感谢文章数:0
获会员感谢数:0
声望力: 0
印前声誉: 0 级 deedeee 草根印前
默认 回复: Война с японией 1945 краткое содержание.

Overseeing the project team's cooperation and making sure that any risks are adequately managed during the design phase are the principal designer role. They also have the knowledge and experience needed to oversee and plan the preconstruction stage, which includes any design work done after construction has started.
deedeee 当前离线   回复时引用此帖